windmine logo

 

Visiting & Monitoring

Guided tours during erection and subsequent operation will be available. A plaque will be attached to the base of the turbine on completion with your chosen inscription.

You may visit your turbines at anytime after initial construction free of charge. Notice will be required for groups of more than 5 people.

The performance of your turbine will be logged continuously and the following information will be available on the internet and on mobile devices:

  • Real time energy output performance
  • Trended energy output over previous days/week/months
  • Real time and historical wind speed and direction
  • Carbon footprint offset achieved
  • Webcam view of windfarm in action

This data will all be available to you through a password protected area of this site

 

 
back to concept
design by hazelwood design
legal
© copyright 2006 windmine